top of page
Search

Kitchen Remodeling in Naples, FL: Costs, Timeline & What to Expect in 2026

If you're considering a kitchen remodel in Naples, FL, you're likely asking two main questions: How much will it cost? and How long will it take?

In Southwest Florida, especially in coastal communities like Naples, kitchen remodeling requires thoughtful planning. Between humidity considerations, high-end design expectations, and material durability, a kitchen remodel here is different from other parts of the country.

This guide breaks down realistic costs, timelines, and what homeowners should expect before starting a kitchen renovation.


Kitchen Remodel in Pelican Bay, Naples FL - By Naples Flooring Gallery
Kitchen Remodel in Pelican Bay, Naples FL - By Naples Flooring Gallery

What Impacts Kitchen Remodeling Costs in Naples?


Kitchen remodeling costs in Naples vary based on:

  • Kitchen size

  • Cabinet quality and brand

  • Structural or layout changes

  • Countertop material

  • Appliance upgrades

  • Electrical and plumbing modifications

  • Flooring replacement

  • Coastal-grade materials for humidity resistance

Luxury remodels in Naples often require upgraded finishes designed to handle moisture, salt air, and long-term durability — especially in waterfront communities.


Average Kitchen Remodeling Cost in Naples


Most kitchen remodels in Naples fall between:

$40,000 – $80,000

The final investment depends largely on:

  • Cabinet line selection (semi-custom vs. full custom)

  • Scope of demolition and layout changes

  • Material selections (quartz, quartzite, porcelain, hardwood-look tile, etc.)

  • Lighting upgrades and design details

Smaller cosmetic remodels may fall below this range, while high-end luxury transformations with structural changes and premium appliances can exceed it.


How Long Does a Kitchen Remodel Take?


A common misconception is that kitchen remodeling starts and finishes quickly. In reality, proper planning and material ordering take time.


Step 1: Cabinet Ordering Timeline

Cabinets are typically the longest lead-time item in a remodel.

Cabinet lead times range from 6 to 12 weeks, depending on the manufacturer and customization level.

Semi-custom cabinet lines often ship faster, while fully customized cabinetry requires longer production times.


Step 2: Construction Timeline

Once cabinets are received, the active remodeling phase typically takes:

4 to 8 weeks

This timeframe includes:

  • Demolition

  • Electrical and plumbing rough-ins

  • Drywall and preparation

  • Flooring installation (if included)

  • Cabinet installation

  • Countertop templating and installation

  • Backsplash and finish work

  • Final inspections

Structural modifications or permit delays can extend this timeline.


Kitchen Remodel in Pelican Bay, Naples FL - By Naples Flooring Gallery
Kitchen Remodel in Pelican Bay, Naples FL - By Naples Flooring Gallery

Why Kitchen Remodeling in Naples Requires Coastal Planning


Naples homes experience:

  • High humidity

  • Salt air (especially near the water)

  • Seasonal occupancy patterns

  • HOA and condo association requirements

Choosing moisture-resistant cabinet finishes, quality hardware, and durable countertops is critical for long-term performance.

Working with an experienced Naples remodeling contractor ensures materials and installation methods are suited for Southwest Florida conditions.


Frequently Asked Questions


How much does kitchen remodeling cost in Naples?

Kitchen remodeling costs in Naples vary based on size, materials, and structural changes. Luxury remodels in coastal communities typically require upgraded materials suited for humidity and long-term durability. Average kitchen remodeling costs in Naples are between $40,000 to $80,000, depending on cabinet lines and scope of work.


How long does it take for a kitchen cabinet order?

Cabinet lead times range from 6 weeks to 12 weeks, depending on the cabinet line and customization level selected.


How long does a kitchen remodel take?

A full kitchen remodel typically takes 4–8 weeks after cabinets are received. Cabinet order lead times are 6–12 weeks depending on the brand.


Planning Your Naples Kitchen Remodel


The key to a successful kitchen remodel in Naples is:

  • Proper budgeting

  • Early cabinet ordering

  • Selecting humidity-appropriate materials

  • Working with a licensed and insured local contractor

  • Coordinating permits and HOA approvals in advance

When planned correctly, a kitchen remodel not only improves daily functionality but significantly increases home value — especially in the competitive Naples real estate market.

 
 
 

Comments


bottom of page